Relocation of the Compactor Feed Chute - Mosaic Esterhazy K2
March designed the chutework to effectively feed the new compactor. For this project, March created construction drawings to relocate the chute to accommodate the new compactor as well as engineering and construction drawings for three future compactor change outs. As a part of this project, March completed 3D scanning of the area in the vicinity of the compactors, feed chutes, feed bin and supporting structural steel to determine steel elevations and accurate inlet/discharge work point locations. With this information March determined all required dimensions for finalizing the feed chutes design.