Sclairpipe® Project - Nutrien Allan
March provided conceptual design and capital cost estimate for Phase 1 of this project to replace the existing steel tailings lines with High-Density Polyethylene (HDPE) pipes. Upon completion of Phase 1, March was awarded Phase 2 of the project which included the detailed design of the new HDPE pipes. The images to the right illustrate the 3D model and the installed new HDPE Sclairpipe® (shown in black).